Monday 20 October 2014

Upgrades

We paid our deposit to Allworth Homes yesterday so our changes will be sent of to get drawn up this week sometime. Should take about 5 weeks to get back they say so we will see how that goes. We got a few extras done as we are building a price leader home and not much is included, we are getting the gas package and colour bond roof.

  • Moving the fridge position to window side of the kitchen - having the stove and the bench in the centre of the wall - no charge
  • Waterfall edge to kitchen bench top - $235
  • Upgrade stove to omega tuscany with wok burner - $120
  • Ducted range hood and bulkheads in kitchen - $475 + $420
  • Overhead cupboard to fridge space - $275
  • Splash back tiles to bottom of overheads - $465
  • Getting pantry door to Lin1 door - no charge
  • Sliding cavity door to the entrance of kitchen/dining/family area - $250
  • Getting tiles instead of carpet in both hallways - $275 + $695
  • Removing linen cupboard from bathroom and moving to computer nook - no charge
  • Switching position of toilet and vanity in main bathroom - no charge
  • Extending vanity in main bathroom 1.5m - $350
  • Drawers to both vanities - $200 each
  • Creating cavity in media room middle wall - $120
  • Extending bed 2 & 4 wardrobes to 1.2m - $35 each
  • Extending bed 4 to wall line - $820
  • 1.4 single garage door - $1020
  • Tiled recess to both showers - $295 each 
  • Front door lock to trilock 3 in 1 - $170
  • External hung door to garage - $320
  • Price lock for 12 months - $5000

Rough Draft of the changes

Saturday 4 October 2014

Loan Approved

Got a call from the Mortgage broker yesterday letting us know that our loan has been approved for both land and construction!!! Also paid a visit to Allworth in Chisholm to get a quote as we will be getting a fixed price hopefully we will get that back next weekend.